Permits - Buildings

Gas Permit Applications
In order to issue a gas permit, the applicant must submit:

  • Completed permit application
  • Method of payment

Eligibility

  • For a single-family dwelling, the applicant may be the owner and occupant of the property or may be a Certified Gas Contractor.

Site Inspection Stages

  • Final Inspection: Project is complete. (note - IJD does not perform or inspect air tests)
Minimum Cover Requirements

Gas Lines-Minimum Cover

Non-vehicular Areas

Vehicular Areas

15”

24”

Note: Minimum cover means the distance between the top surface of the conductor, cable, raceway or conduit and the finished grade